Bid Package Information

Opportunities will be updated as the Lakeside Program develops

Please stay tuned for updates as direct work packages are released for bid. 

All prime / 1st tier contractors are strongly encouraged to prequalify prior to the prequalification deadline date outlined in this matrix.  

 

 

Package NumberPackage NamePackage Scope DescriptionApprox VolumePrebid/Outreach Meeting DatePrequalification DeadlineITB Issuance DateBids Due
04A-001Site UtilitiesDomestic, sanitary sewer, and storm drainage site utilities for the project site.$4,011,000$5,191,0006/30/20216/30/20217/13/20218/13/2021
04A-002Building Façade StoneExterior Façade Cladding: Supply, fabrication and installation of stone for exterior building cladding. This package includes the support framing and insulation required for a complete system.$23,559,000$30,488,0006/20/20215/20/2021 6/17/20217/17/2021
04A-003Interior StoneInterior Stone: Supply, fabrication, and Installation of stone for interior flooring, benches, etc.$4,670,000$6,043,0006/2/20215/20/202110/4/202111/3/2021
04A-004Exterior StoneExterior Site Stone: Supply, fabrication, and installation of stone for exterior seating, stairs, and cladding at site retaining walls.$726,000$940,0006/2/20215/20/202110/4/202111/3/2021
04A-005UHPCExterior UHPC Screen Wall$7,277,000$9,417,0006/2/20215/20/2021 6/17/20217/17/2021
04A-006Metal PanelsMetal panels for the museum, forum, library, and parking garage.$1,492,000$1,931,0006/30/20217/12/20218/9/20219/8/2021
04A-007ElevatorsPassenger and service elevators for the museum, forum, and library.$4,923,000$6,371,0006/30/20216/30/20217/13/20218/13/2021
04A-008EscalatorsEscalators for the museum.$1,277,000$1,653,0006/30/20216/30/20217/13/20218/13/2021
04A-009Curtian Wall & StorefrontCurtain wall and storefront for the museum, forum, and library.$10,733,000$13,889,0006/2/20215/20/20216/17/20217/17/2021
04A-010Curtian Wall & StorefrontCurtain wall and storefront for the parking garage$227,000$294,0006/2/20215/20/20216/17/20217/17/2021
04A-012HVACHVAC system for conditioned spaces of the parking garage. Fuel oil and exhaust system for generators.$1,550,000$2,006,0006/30/20216/30/20217/13/20218/13/2021
04A-013HVACRefrigerant, hot water, chilled water piping and associated equipment in the museum, forum, and library.$4,952,350$8,603,1026/30/20216/30/2021 7/13/20218/13/2021
04A-014HVACDuctwork, associated equipment, and temperature control in the museum, forum, and library.$14,568,902$20,571,0306/30/20216/30/20217/13/20218/13/2021
04A-015PlumbingPlumbing system for the museum, forum, and library.$3,832,000$4,960,0006/30/20216/30/20217/13/20218/13/2021
04A-016PlumbingPlumbing system for the parking garage.$865,000$1,120,0006/30/20216/30/20217/13/20218/13/2021
04B-001Fire AlarmFire alarm system for the project.$1,632,000$2,112,0006/30/20216/30/2021 7/13/20218/13/2021
04B-002TelecommunicationsTelecommunications system for the museum, forum, and library.$6,766,000$8,756,0006/30/20216/30/20217/13/20218/13/2021
04B-003TelecommunicationsTelecommunications system and DAS system for the garage.$934,000$1,209,0006/30/20216/30/20217/13/20218/13/2021
04B-004TelecommunicationsTelecommunications system for the site.$338,000$437,0006/30/20216/30/20217/13/20218/13/2021
04B-005Fire SuppressionFire suppression system for the museum, forum, library, and parking structure.$2,451,000$3,172,0006/30/20216/15/20217/13/20218/13/2021
04B-006Site ElectricSite electrical distribution systems and lighting (Includes Temp Power and Lighting).$5,271,575$7,170,5756/30/20216/15/20217/13/20218/13/2021
04B-007ElectricalElectrical distribution system in the museum, forum, and library including electrical equipment and lighting.$15,989,775$22,715,7756/30/20216/15/20217/13/20218/13/2021
04B-008ElectricalElectrical distribution system in the parking garage including electrical equipment and lighting.$1,926,231$2,534,2316/30/20216/15/20217/13/20218/13/2021
04B-009Electrical DuctbanksElectrical distribution ductbanks.$342,000$442,0006/30/20216/15/20217/13/20218/13/2021
04B-010SecuritySecurity systems for the project including access control, cameras, etc.$2,093,000$2,709,0006/30/20216/15/20217/13/20218/13/2021
04B-011Damp proofing, Waterproofing, & Joint SealantsWaterproofing for the Museum, Forum, and Library.$2,034,000$2,632,0007/28/20217/12/20218/9/20219/8/2021
04B-012Damp proofing, Waterproofing, & Joint SealantsWaterproofing for the Parking Garage & Site.$254,000$328,0007/28/20217/12/20218/9/20219/8/2021
04B-013RoofingRoofing for the museum.$776,000$1,004,0007/28/20217/12/20218/9/20219/8/2021
04B-014RoofingRoofing for the forum and library.$3,435,000$4,445,0007/28/20217/12/20218/9/20219/8/2021
04B-015Structural SteelStructural steel framing for the tower, forum, and library including, but not limited to auditorium framing, catwalk framing, and elevator beams.$298,000$385,0006/30/20216/8/20217/6/20218/5/2021
04B-016Tower Steel StairsSteel stairs and associated railings for the museum.$698,000$903,0006/30/20216/8/20217/6/20218/5/2021
04B-017Forum Library StairsSteel stairs and associated railings for the forum and library.$151,000$195,0006/30/20216/8/20217/6/20218/5/2021
04B-018Spray FireproofingSpray fireproofing for structural steel$32,000$41,0006/30/20216/8/20217/6/20218/5/2021
05-001MasonryCMU wall construction in the tower.$610,000$789,0007/28/20217/12/20218/9/20219/8/2021
05-002MasonryCMU wall construction in the forum and library.$943,000$1,220,0007/28/20217/12/20218/9/20219/8/2021
05-003MasonryCMU wall construction in the parking garage.$217,000$281,0007/28/20217/12/20218/9/20219/8/2021
05-004Misc MetalsMiscellaneous metals for the tower.$2,168,000$2,806,0007/28/20217/12/20218/9/20219/8/2021
05-005Misc MetalsMiscellaneous metals for the forum and library.$405,000$524,0007/28/20217/12/20218/9/20219/8/2021
05-006Misc MetalsMiscellaneous metals for the parking structure.$171,000$222,0007/28/20217/12/20218/9/20219/8/2021
05-007Tower Ornamental StairMuseum lobby ornamental stairs & assoicated ornamental stair railings.$800,000$1,035,0007/28/20217/12/20218/9/20219/8/2021
05-008Forum Library Ornamental StairsMuseum lobby ornamental railing for stairs.$46,000$60,0007/28/20217/12/2021 8/9/20219/8/2021
05-009Ornamental MetalsOrnamental metals & Ornamental Glass Rails for the tower.$3,577,000$4,629,0007/28/20217/12/20218/9/20219/8/2021
05-010Ornamental MetalsOrnamental metals & Ornamental Glass Rails for the forum and library.$1,138,000$1,472,0007/28/20217/12/20218/9/20219/8/2021
05-011Ornamental MetalsOrnamental metals & Ornamental Glass Rails for the parking structure.$47,000$61,0007/28/20217/12/20218/9/20219/8/2021
05-012Ornamental MetalsOrnamental metals & Ornamental Glass Rails for the site including handrails and plant rails.$769,000$995,0007/28/20217/12/20218/9/20219/8/2021
05-013Rough CarpentryRough carpentry and installation of doors, frames, and hardware for the tower.$859,000$1,112,0008/25/20218/9/20219/6/202110/6/2021
05-014Rough CarpentryRough carpentry and installation of doors, frames, and hardware for the forum and library.$302,000$391,0008/25/20218/9/20219/6/202110/6/2021
05-015Rough CarpentryRough carpentry and installation of doors, frames, and hardware for the parking garage.$130,000$169,0008/25/20218/9/20219/6/202110/6/2021
05-016Door, Frames, and HardwareSupply of doors, frames, and hardware for museum, forum, and library.$2,168,000$2,806,0008/25/20218/9/20219/6/202110/6/2021
05-017Door, Frames, and HardwareSupply of doors, frames, and hardware for the parking garage.$164,000$212,0008/25/20218/9/20219/6/202110/6/2021
05-018Specialty Doors and FramesFire shutters and overhead coiling doors.$346,000$448,0008/25/20218/9/20219/6/202110/6/2021
05-019Gypsum Board AssembliesFraming, drywall, and insulation for the tower.$4,650,000$6,018,0008/25/20218/9/20219/6/202110/6/2021
05-020Gypsum Board AssembliesFraming, drywall, and insulation for the forum and library.$3,078,000$3,983,0008/25/20218/9/20219/6/202110/6/2021
05-021Gypsum Board AssembliesFraming, drywall, and insulation for the parking garage.$49,000$63,0008/25/20218/9/20219/6/202110/6/2021
05-022Acoustical CeilingsAcoustical ceilings for the tower.$255,000$331,0008/25/20218/9/20219/6/202110/6/2021
05-023Acoustical CeilingsAcoustical ceilings for the forum library and parking garage.$287,000$372,0008/25/20218/9/20219/6/202110/6/2021
05-024Wood CeilingsWood ceiling panels for the tower, forum, and library.$1,370,000$1,773,0008/25/20218/9/20219/6/202110/6/2021
05-025Architectural WoodworkMillwork for the tower.$1,308,000$1,692,0008/25/20218/9/20219/6/202110/6/2021
05-026Architectural WoodworkMillwork for the forum and library.$2,387,000$3,089,0008/25/20218/9/20219/6/202110/6/2021
05-027Architectural WoodworkMillwork for the parking garage.$17,000$21,0008/25/20218/9/20219/6/202110/6/2021
05-028Wood Wall PanelsWood wall panels in the museum, forum, and library.$1,505,000$1,948,0008/25/20218/9/20219/6/202110/6/2021
05-029Auditorium Vertical Sliding DoorCounter Balanced Door$186,000$241,0008/25/20218/9/20219/6/202110/6/2021
05-030Interior Glass & GlazingInterior Glass and Glazing$703,000$909,0008/25/20218/9/20219/6/202110/6/2021
05-031TileCeramic and porcelain tile for the tower.$565,000$731,0008/25/20218/9/20219/6/202110/6/2021
05-032TileCeramic and porcelain tile for the forum and library.$268,000$347,0008/25/20218/9/20219/6/202110/6/2021
05-033TileCeramic and porcelain tile for the parking garage.$29,000$38,0008/25/20218/9/20219/6/202110/6/2021
05-034Flooring (Resilient & Carpeting)Resilient flooring, carpet, and vinyl base for the tower.$62,000$80,0009/22/20219/6/202110/4/202111/3/21
05-035Flooring (Resilient & Carpeting)Resilient flooring, carpet, and vinyl base for the forum and library.$289,000$374,0009/22/20219/6/202110/4/202111/3/21
05-036Flooring (Resilient & Carpeting)Resilient flooring, carpet, and vinyl base for the parking garage.$5,000$7,0009/22/20219/6/202110/4/202111/3/21
05-037Flooring (Resinous Flooring)Resinous Flooring & Traffic Coating.$543,000$702,0009/22/20219/6/202110/4/202111/3/21
05-038Moisture Mitigation Floor Preparation$367,000$475,0009/22/20219/6/202110/4/202111/3/21
05-039Wood FlooringWood flooring for the tower, forum, and library.$2,648,000$3,426,0009/22/20219/6/202110/4/202111/3/21
05-040Painting & Wall CoveringsPaint and wall coverings for the tower.$525,000$679,0009/22/20219/6/202110/4/202111/3/21
05-041Painting & Wall CoveringsPaint and wall coverings for the forum and library.$800,000$1,035,0009/22/20219/6/202110/4/202111/3/21
05-042Painting & Wall CoveringsPaint and wall coverings for the parking garage.$29,000$38,0009/22/20219/6/202110/4/202111/3/21
05-043Architectural Louvers & VentsAluminum and bronze louvers and grilles.$312,000$404,0009/22/20219/6/202110/4/202111/3/21
05-044Division 10 SpecialtiesDivision 10 specialties for the tower including toilet accessories, lockers, and walk off mats.$399,000$516,0009/22/20219/6/202110/4/202111/3/21
05-045Division 10 SpecialtiesDivision 10 specialties for the forum and library including toilet accessories, lockers, and walk off mats.$480,000$621,0009/22/20219/6/202110/4/202111/3/21
05-046Division 10 SpecialtiesDivision 10 specialties for the parking garage including toilet accessories, lockers, and walk off mats.$42,000$55,0009/22/20219/6/202110/4/202111/3/21
05-047High Density FilesMobile Shelves$172,000$222,0009/22/20219/6/202110/4/202111/3/2021
05-048Coat Rack SystemFurnish and install coat rack system in the museum.$39,000$50,0009/22/20219/6/202110/4/202111/3/2021
05-049Book Depository & Fireplace$20,000$26,0009/22/20219/6/202110/4/202111/3/2021
05-050Demountable PartitionsFurnish and install demountable partitions in the forum and library.$249,000$322,0009/22/20219/6/202110/4/202111/3/2021
05-051Operable PartitionsFurnish and install operable partitions in the forum and library.$225,000$291,0009/22/20219/6/202110/4/202111/3/2021
05-052Loading Dock EquipmentFurnish and install loading dock levelers, bumpers, and trash compactor.$78,000$101,0009/22/20219/6/202110/4/202111/3/2021
05-053Cold StorageFurnish and install cold storage at the parking garage.$86,000$111,0009/22/20219/6/202110/4/202111/3/2021
05-054Food Service Equipment & AppliancesFurnish and install food service equipment at the museum, forum, and library.$1,162,000$1,504,0009/22/20219/6/202110/4/202111/3/2021
05-055Fall Arrest & MaintenanceFall arrest and façade maintenance system for the museum. System includes horizontal lifelines and tiebacks.$597,000$772,00010/27/202110/4/202111/1/202112/1/2021
05-056Auditorium EquipmentRamps wih railing only$19,000$25,00010/27/202110/4/202111/1/202112/1/2021
05-057Stage Engineering SystemStage flooring and rigging systems including trusses, shades, and curtain systems.$1,233,000$1,596,00010/27/202110/4/202111/1/202112/1/2021
05-058Specialty & Performance Lighting/AV SystemLow voltage wiring to support specialty systems in the auditorium.$586,000$758,00010/27/202110/4/202111/1/202112/1/2021
05-059Window TreatmentsWindow treatments for the museum.$243,000$314,00010/27/202110/4/202111/1/202112/1/2021
05-060Window TreatmentsWindow treatments for the forum and library.$339,000$439,00010/27/202110/4/202111/1/202112/1/2021
05-061Wheelchair LiftsWheelchair lifts for the forum and library.$37,000$48,00010/27/202110/4/202111/1/202112/1/2021
05-062Site EarthworkImporting soil, grading, and hardscape subgrade preparation.$2,627,000$3,400,00010/27/202110/4/202111/1/202112/1/2021
05-063Unit PaversGranite vehicular and pedestrian paving.$3,620,000$4,684,00010/27/202110/4/202111/1/202112/1/2021
05-064Site ConcreteConcrete paving, stairs, and retaining walls.$3,674,000$4,755,00010/27/202110/4/202111/1/202112/1/2021
05-065Pavement MarkingsParking striping and markings for the parking garage.$13,000$17,00010/27/202110/4/202111/1/202112/1/2021
05-066Asphalt PavingAsphalt paving for the project site.$986,000$1,276,00010/27/202110/4/202111/1/202112/1/2021
05-067Vehicular ControlAutomated, Manual & Fixed bollards for vehicle control.$1,394,000$1,804,00010/27/202110/4/202111/1/202112/1/2021
05-068Landscaping – IrrigationIrrigation systems for the landscaping.$847,000$1,096,00010/27/202110/4/202111/1/202112/1/2021
05-069Landscaping – PlantingsPlantings and mulch for the project site.$10,281,000$13,305,00010/27/202110/4/202111/1/202112/1/2021
05-070Landscaping – Underdrainage$509,000$659,00010/27/202110/4/202111/1/202112/1/2021
05-071Landscaping – Accessories & Play EquipmentLandscaping accessories including play equipment.$5,064,000$6,553,00010/27/202110/4/202111/1/202112/1/2021
05-072GeofoamGeofoam fill for the project site.$4,148,000$5,368,00010/27/202110/4/202111/1/202112/1/2021