Bid Package Information
**Dates are subject to change. Please stay connected to Lakeside Alliance for updates.**
BID PACKAGE MATRIX ** | |||||||
Package Number | Package Name | Package Scope Description | Approx Volume | Prebid/Outreach Meeting Date | ITB Issuance Date | Bids Due | |
03-001 | Site Clearing | Site | $1,437,000 | $1,860,000 | 3/18/2021 (A) | 4/12/2021 | 5/7/2021 |
03-002 | Mass and Structural Excavation | Tower, Forum & Library | $4,112,000 | $5,321,000 | 3/18/2021 (A) | 4/12/2021 | 5/7/2021 |
03-003 | Mass and Structural Excavation | Parking Structure | $2,137,000 | $2,765,000 | 3/18/2021 (A) | 4/12/2021 | 5/7/2021 |
03-004 | Caissons | Tower, Forum & Library | $3,032,000 | $3,923,000 | 4/8/2021 | 4/12/2021 | 5/7/2021 |
03-005 | Caissons | Parking Structure | $1,452,000 | $1,880,000 | 4/8/2021 | 4/12/2021 | 5/7/2021 |
03-006 | Geothermal Wells | $2,296,000 | $2,972,000 | 4/8/2021 | 4/12/2021 | 5/7/2021 | |
03-007 | Construction Dewatering | Tower, Forum & Library | $1,126,000 | $1,458,000 | 4/8/2021 | 4/12/2021 | 5/7/2021 |
03-008 | Construction Dewatering | Parking Structure | $549,000 | $711,000 | 4/8/2021 | 4/12/2021 | 5/7/2021 |
03-009 | Early Landscape | Site | $339,000 | $439,000 | 4/8/2021 | 4/12/2021 | 5/7/2021 |
04A-001 | Site Utilities | Domestic, sanitary sewer, and storm drainage site utilities for the project site. | $4,011,000 | $5,191,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-002 | Building Façade Stone | Exterior Façade Cladding: Supply, fabrication and installation of stone for exterior building cladding. This package includes the support framing and insulation required for a complete system. | $23,559,000 | $30,488,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-003 | Interior Stone | Interior Stone: Supply, fabrication, and Installation of stone for interior flooring, benches, etc. | $4,670,000 | $6,043,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-004 | Exterior Stone | Exterior Site Stone: Supply, fabrication, and installation of stone for exterior seating, stairs, and cladding at site retaining walls. | $726,000 | $940,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-005 | UHPC | Exterior UHPC Screen Wall | $7,277,000 | $9,417,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-006 | Metal Panels | Metal panels for the museum, forum, library, and parking garage. | $1,492,000 | $1,931,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-007 | Elevators | Passenger and service elevators for the museum, forum, and library. | $4,923,000 | $6,371,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-008 | Escalators | Escalators for the museum. | $1,277,000 | $1,653,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-009 | Curtian Wall & Storefront | Curtain wall and storefront for the museum, forum, and library. | $10,733,000 | $13,889,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-010 | Curtian Wall & Storefront | Curtain wall and storefront for the parking garage | $227,000 | $294,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-011 | Full Façade Assembly Mockup | $331,000 | $428,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 | |
04A-012 | HVAC | HVAC system for conditioned spaces of the parking garage. Fuel oil and exhaust system for generators. | $1,550,000 | $2,006,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-013 | HVAC | Refrigerant, hot water, chilled water piping and associated equipment in the museum, forum, and library. | $6,165,000 | $7,978,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-014 | HVAC | Ductwork, associated equipment, and temperature control in the museum, forum, and library. | $15,982,000 | $20,682,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-015 | Plumbing | Plumbing system for the museum, forum, and library. | $3,832,000 | $4,960,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04A-016 | Plumbing | Plumbing system for the parking garage. | $865,000 | $1,120,000 | 4/28/2021 | 5/10/2021 | 6/4/2021 |
04B-001 | Fire Alarm | Fire alarm system for the project. | $1,632,000 | $2,112,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-002 | Telecommunications | Telecommunications system for the museum, forum, and library. | $6,766,000 | $8,756,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-003 | Telecommunications | Telecommunications system and DAS system for the garage. | $934,000 | $1,209,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-004 | Telecommunications | Telecommunications system for the site. | $338,000 | $437,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-005 | Fire Suppression | Fire suppression system for the museum, forum, library, and parking structure. | $2,451,000 | $3,172,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-006 | Site Electric | Site electrical distribution systems and lighting (Includes Temp Power and Lighting). | $6,455,000 | $8,354,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-007 | Electrical | Electrical distribution system in the museum, forum, and library including electrical equipment and lighting. | $22,865,000 | $29,591,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-008 | Electrical | Electrical distribution system in the parking garage including electrical equipment and lighting. | $2,065,000 | $2,673,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-009 | Electrical Ductbanks | Electrical distribution ductbanks. | $342,000 | $442,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-010 | Security | Security systems for the project including access control, cameras, etc. | $2,093,000 | $2,709,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-011 | Damp proofing, Waterproofing, & Joint Sealants | Waterproofing for the Museum, Forum, and Library. | $2,034,000 | $2,632,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-012 | Damp proofing, Waterproofing, & Joint Sealants | Waterproofing for the Parking Garage & Site. | $254,000 | $328,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-013 | Roofing | Roofing for the museum. | $776,000 | $1,004,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-014 | Roofing | Roofing for the forum and library. | $3,435,000 | $4,445,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-015 | Structural Steel | Structural steel framing for the tower, forum, and library including, but not limited to auditorium framing, catwalk framing, and elevator beams. | $298,000 | $385,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-016 | Tower Steel Stairs | Steel stairs and associated railings for the museum. | $698,000 | $903,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-017 | Forum Library Stairs | Steel stairs and associated railings for the forum and library. | $151,000 | $195,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
04B-018 | Spray Fireproofing | Spray fireproofing for structural steel | $32,000 | $41,000 | 6/2/2021 | 6/14/2021 | 7/9/2021 |
05-001 | Masonry | CMU wall construction in the tower. | $610,000 | $789,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-002 | Masonry | CMU wall construction in the forum and library. | $943,000 | $1,220,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-003 | Masonry | CMU wall construction in the parking garage. | $217,000 | $281,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-004 | Misc Metals | Miscellaneous metals for the tower. | $2,168,000 | $2,806,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-005 | Misc Metals | Miscellaneous metals for the forum and library. | $405,000 | $524,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-006 | Misc Metals | Miscellaneous metals for the parking structure. | $171,000 | $222,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-007 | Tower Ornamental Stair | Museum lobby ornamental stairs & assoicated ornamental stair railings. | $800,000 | $1,035,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-008 | Forum Library Ornamental Stairs | Museum lobby ornamental railing for stairs. | $46,000 | $60,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-009 | Ornamental Metals | Ornamental metals & Ornamental Glass Rails for the tower. | $3,577,000 | $4,629,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-010 | Ornamental Metals | Ornamental metals & Ornamental Glass Rails for the forum and library. | $1,138,000 | $1,472,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-011 | Ornamental Metals | Ornamental metals & Ornamental Glass Rails for the parking structure. | $47,000 | $61,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-012 | Ornamental Metals | Ornamental metals & Ornamental Glass Rails for the site including handrails and plant rails. | $769,000 | $995,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-013 | Rough Carpentry | Rough carpentry and installation of doors, frames, and hardware for the tower. | $859,000 | $1,112,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-014 | Rough Carpentry | Rough carpentry and installation of doors, frames, and hardware for the forum and library. | $302,000 | $391,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-015 | Rough Carpentry | Rough carpentry and installation of doors, frames, and hardware for the parking garage. | $130,000 | $169,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-016 | Door, Frames, and Hardware | Supply of doors, frames, and hardware for museum, forum, and library. | $2,168,000 | $2,806,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-017 | Door, Frames, and Hardware | Supply of doors, frames, and hardware for the parking garage. | $164,000 | $212,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-018 | Specialty Doors and Frames | Fire shutters and overhead coiling doors. | $346,000 | $448,000 | 7/28/2021 | 8/9/2021 | 9/3/2021 |
05-019 | Gypsum Board Assemblies | Framing, drywall, and insulation for the tower. | $4,650,000 | $6,018,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-020 | Gypsum Board Assemblies | Framing, drywall, and insulation for the forum and library. | $3,078,000 | $3,983,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-021 | Gypsum Board Assemblies | Framing, drywall, and insulation for the parking garage. | $49,000 | $63,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-022 | Acoustical Ceilings | Acoustical ceilings for the tower. | $255,000 | $331,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-023 | Acoustical Ceilings | Acoustical ceilings for the forum library and parking garage. | $287,000 | $372,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-024 | Wood Ceilings | Wood ceiling panels for the tower, forum, and library. | $1,370,000 | $1,773,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-025 | Architectural Woodwork | Millwork for the tower. | $1,308,000 | $1,692,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-026 | Architectural Woodwork | Millwork for the forum and library. | $2,387,000 | $3,089,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-027 | Architectural Woodwork | Millwork for the parking garage. | $17,000 | $21,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-028 | Wood Wall Panels | Wood wall panels in the museum, forum, and library. | $1,505,000 | $1,948,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-029 | Auditorium Vertical Sliding Door | Counter Balanced Door | $186,000 | $241,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-030 | Interior Glass & Glazing | Interior Glass and Glazing | $703,000 | $909,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-031 | Tile | Ceramic and porcelain tile for the tower. | $565,000 | $731,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-032 | Tile | Ceramic and porcelain tile for the forum and library. | $268,000 | $347,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-033 | Tile | Ceramic and porcelain tile for the parking garage. | $29,000 | $38,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-034 | Flooring (Resilient & Carpeting) | Resilient flooring, carpet, and vinyl base for the tower. | $62,000 | $80,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-035 | Flooring (Resilient & Carpeting) | Resilient flooring, carpet, and vinyl base for the forum and library. | $289,000 | $374,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-036 | Flooring (Resilient & Carpeting) | Resilient flooring, carpet, and vinyl base for the parking garage. | $5,000 | $7,000 | 8/25/2021 | 9/6/2021 | 10/1/2021 |
05-037 | Flooring (Resinous Flooring) | Resinous Flooring & Traffic Coating. | $543,000 | $702,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-038 | Moisture Mitigation Floor Preparation | $367,000 | $475,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 | |
05-039 | Wood Flooring | Wood flooring for the tower, forum, and library. | $2,648,000 | $3,426,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-040 | Painting & Wall Coverings | Paint and wall coverings for the tower. | $525,000 | $679,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-041 | Painting & Wall Coverings | Paint and wall coverings for the forum and library. | $800,000 | $1,035,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-042 | Painting & Wall Coverings | Paint and wall coverings for the parking garage. | $29,000 | $38,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-043 | Architectural Louvers & Vents | Aluminum and bronze louvers and grilles. | $312,000 | $404,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-044 | Division 10 Specialties | Division 10 specialties for the tower including toilet accessories, lockers, and walk off mats. | $399,000 | $516,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-045 | Division 10 Specialties | Division 10 specialties for the forum and library including toilet accessories, lockers, and walk off mats. | $480,000 | $621,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-046 | Division 10 Specialties | Division 10 specialties for the parking garage including toilet accessories, lockers, and walk off mats. | $42,000 | $55,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-047 | High Density Files | Mobile Shelves | $172,000 | $222,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-048 | Coat Rack System | Furnish and install coat rack system in the museum. | $39,000 | $50,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-049 | Book Depository & Fireplace | $20,000 | $26,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 | |
05-050 | Demountable Partitions | Furnish and install demountable partitions in the forum and library. | $249,000 | $322,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-051 | Operable Partitions | Furnish and install operable partitions in the forum and library. | $225,000 | $291,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-052 | Loading Dock Equipment | Furnish and install loading dock levelers, bumpers, and trash compactor. | $78,000 | $101,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-053 | Cold Storage | Furnish and install cold storage at the parking garage. | $86,000 | $111,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-054 | Food Service Equipment & Appliances | Furnish and install food service equipment at the museum, forum, and library. | $1,162,000 | $1,504,000 | 9/22/2021 | 10/4/2021 | 10/29/2021 |
05-055 | Fall Arrest & Maintenance | Fall arrest and façade maintenance system for the museum. System includes horizontal lifelines and tiebacks. | $597,000 | $772,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-056 | Auditorium Equipment | Ramps wih railing only | $19,000 | $25,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-057 | Stage Engineering System | Stage flooring and rigging systems including trusses, shades, and curtain systems. | $1,233,000 | $1,596,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-058 | Specialty & Performance Lighting/AV System | Low voltage wiring to support specialty systems in the auditorium. | $586,000 | $758,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-059 | Window Treatments | Window treatments for the museum. | $243,000 | $314,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-060 | Window Treatments | Window treatments for the forum and library. | $339,000 | $439,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-061 | Wheelchair Lifts | Wheelchair lifts for the forum and library. | $37,000 | $48,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-062 | Site Earthwork | Importing soil, grading, and hardscape subgrade preparation. | $2,627,000 | $3,400,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-063 | Unit Pavers | Granite vehicular and pedestrian paving. | $3,620,000 | $4,684,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-064 | Site Concrete | Concrete paving, stairs, and retaining walls. | $3,674,000 | $4,755,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-065 | Pavement Markings | Parking striping and markings for the parking garage. | $13,000 | $17,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-066 | Asphalt Paving | Asphalt paving for the project site. | $986,000 | $1,276,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-067 | Vehicular Control | Automated, Manual & Fixed bollards for vehicle control. | $1,394,000 | $1,804,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-068 | Landscaping – Irrigation | Irrigation systems for the landscaping. | $847,000 | $1,096,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-069 | Landscaping – Plantings | Plantings and mulch for the project site. | $10,281,000 | $13,305,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-070 | Landscaping – Underdrainage | $509,000 | $659,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 | |
05-071 | Landscaping – Accessories & Play Equipment | Landscaping accessories including play equipment. | $5,064,000 | $6,553,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |
05-072 | Geofoam | Geofoam fill for the project site. | $4,148,000 | $5,368,000 | 10/20/2021 | 11/1/2021 | 11/26/2021 |